| Pipe HDPE 25 mm | Perkakas | Rp 23.050 | 270 |
| Pipe HDPE 20 mm | Perkakas | Rp 18.800 | 270 |
| Elbow hdpe compression 25 mm | Perkakas | Rp 34.980 | 135 |
| Seal tape | Perkakas | Rp 5.100 | 90 |
| Lockable magnetic angle ¾" | Perkakas | Rp 235.000 | 45 |
| Double neple reduser ¾"-½" | Perkakas | Rp 15.425 | 45 |
| Clamp Saddle 3" x 1¼ " | Perkakas | Rp 180.775 | 45 |
| Box water meter dan segel | Perkakas | Rp 155.500 | 45 |
| Brass ball valve female ½ | Perkakas | Rp 151.720 | 45 |
| Straight coupler hdpe compression 25 mm | Perkakas | Rp 24.100 | 45 |
| Straight coupler hdpe compression 20 mm | Perkakas | Rp 19.400 | 45 |
| Atap kran ½" | Perkakas | Rp 114.800 | 45 |
| Cap hdpe coupling 20 mm | Perkakas | Rp 9.100 | 45 |
| Brass water meter ½" | Perkakas | Rp 710.350 | 45 |
| Brass check valve ½" | Perkakas | Rp 161.120 | 45 |
| Ferrule with cutter 25 mm x 1¼" | Perkakas | Rp 146.870 | 45 |
| Tee compression hdpe 20 mm | Perkakas | Rp 38.200 | 45 |
| Elbow Hdpe compression 20 mm x ½" | Perkakas | Rp 18.150 | 45 |
| Threaded Female Elbow 20 mm | Perkakas | Rp 15.800 | 45 |
| Threaded male elbow compression 20 mm x ½" | Perkakas | Rp 12.080 | 45 |
| Pembuatan dokumen SMKK (RKK dan RMPK) | Sistem Manajemen Keselamatan Konstruksi (SMKK) | Rp 1.6 Jt | 0 |
| Pembuatan dokumen SMKK (RKK, RMPK, RKPPL, RMLLP) | Sistem Manajemen Keselamatan Konstruksi (SMKK) | Rp 1.0 Jt | 0 |
| Pemasangan 1 m PIPA PVC AW, DN. 4" (100 mm) | Bidang Cipta Karya | Rp 44.631 | 0 |
| Pemasangan 1 m PIPA PVC AW, DN. 2" (50 mm) | Bidang Cipta Karya | Rp 31.566 | 0 |
| Pembatas area (Restricted Area) | Sistem Manajemen Keselamatan Konstruksi (SMKK) | Rp 80.000 | 0 |
| Sarung tangan kerja (Safety Gloves) | Sistem Manajemen Keselamatan Konstruksi (SMKK) | Rp 20.000 | 0 |
| 1 Buah papan nama pekerjaan ukuran 0,6x0,8 menggunakan multiplex 10 mm, frame aluminium siku & tiang kayu 5/7, printing banner plastik | Bidang Umum | Rp 749.160 | 0 |
| Pemasangan 1 Unit CHECK VALVE 10 K, Dia. 4" (100 mm) | Bidang Cipta Karya | Rp 126.748 | 0 |
| Pemasangan 1 Buah Stub Flange Ø 4" (100 mm) | Bidang Cipta Karya | Rp 122.444 | 0 |
| Pemasangan 1 buah GATE VALVE 10 K, DN 4" (100 mm) | Bidang Cipta Karya | Rp 108.977 | 0 |