Seleksi · 2026 · Akan ditenderkan
The Preparation of Infrastructure Governance, Feasibility Study, and ESIA Documents for The Karang Joang Corridor in Balikpapan City
Direncanakan oleh KANTOR MENTERI NEGARA PPN BAPPENAS, Kementerian Perencanaan Pembangunan Nasional (Kementerian), dengan pagu Rp 9.90 M dan pemilihan penyedia direncanakan Februari 2026.

Rincian rencana
- Kode RUP
- 66042051
- Pagu
- Rp 9.900.000.000
- Metode pemilihan
- Seleksi
- Jenis pengadaan
- Jasa Konsultansi
- Sumber dana
- APBN
- Waktu pemilihan
- Februari 2026
- Instansi
- Kementerian Perencanaan Pembangunan Nasional
- Satuan kerja
- KANTOR MENTERI NEGARA PPN BAPPENAS
- Untuk usaha kecil
- Ya
- Produk dalam negeri
- Ya
- Diumumkan di SIRUP
- 28 Feb 2026
- Juni 2026
- Juni 2027
- Sumber Dana
- No. Sumber Dana T.A. KLPD MAK Pagu 1. APBN - HIBAH LUAR NEGERI (I) 2026 Kementerian Perencanaan Pembangunan Nasional CK.6271.AEA.903.903.0E.522131 1485000000 2. APBN - HIBAH LUAR NEGERI (I) 2027 Kementerian Perencanaan Pembangunan Nasional CK.6271.AEA.903.903.0E.522131 8415000000 Total Pagu 9900000000
- Aspek Sosial
- Ya
- Aspek Ekonomi
- Ya
- Februari 2026
- Juni 2026
- History Paket
- 66011593 - The Preparation of Infrastructure Governance, Feasibility Study, and ESIA Documents for The Karang Joang Corridor in Balikpapan City
- Pra DIPA / DPA
- Tidak
- Aspek Lingkungan
- Ya
- Lokasi Pekerjaan
- No. Provinsi Kabupaten/Kota Detail Lokasi 1. Kalimantan Timur Balikpapan (Kota) Karang Joang
- Volume Pekerjaan
- 1 paket
- Pemanfaatan Barang/Jasa
- Mulai Akhir Juni 2026 Juni 2027
- Jadwal Pemilihan Penyedia
- Mulai Akhir Februari 2026 Juni 2026
- Terdeteksi Bidnesia
- 16 Okt 2026
Uraian pekerjaan
1. Preparation of Infrastructure Governance Assessment to make sure the viability of sub-projects facilitated in Balikpapan City 2. Preparation of feasibilities studies (FS) and Environmental and Social Impact Assessment (ESIA) complemented with biodiversity assessment of Karang Joang Energy and Conservation Hub to support the fulfilment of readiness criteria for selected sub-projects in the GEF Indonesia SCIP program and in accordance with feasibility study preparation guideline. 3. Preparation of feasibilities studies (FS) and Environmental and Social Impact Assessment (ESIA) complemented with biodiversity assessment of Karang Joang Circular and Water Sustainability Initiatives to support the fulfilment of readiness criteria for selected sub-projects in the GEF Indonesia SCIP program and in accordance with feasibility study preparation guideline.
Begitu paket ini tayang di LPSE, Bidnesia bisa langsung menunjukkan HPS, peserta, dan rekam jejak pesaingnya. Daftar gratis untuk mengikuti instansi ini.
Ikuti Kementerian Perencanaan Pembangunan NasionalSumber: SIRUP LKPP, kode RUP 66042051. Data rencana dapat direvisi instansi; nilai pagu bukan HPS dan bukan nilai kontrak.
